Customization: | Available |
---|---|
Condition: | New |
Customized: | Customized |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
EXPERIMENTS |
|||
• Meter box installation | • Construction specific cations learning and training | ||
• Distribution box installation | • Construction safety requirements learning and training | ||
• Fluorescent lamp installation | • Remote and local control of one lamp | ||
• Incandescent light installation | • Trunking wiring construction training | ||
• Ceiling lamp installation | • Concealed work construction training | ||
• Energy saving lamp installation | • Disconnecting switch installation | ||
• High pressure sodium lamp installation | • Distribution line wiring training | ||
• PVC pipe processing and layout | 1) | . Metal bridge combination and installation training | |
• PVC pipe threading | 2) | . Plastic trunking laying training | |
• Switch and socket installation | 3) | . Metal line pipe laying training | |
• Junction box installation | • Electrical control box installation | ||
• Line distribution design |
Inputvoltage | three-phase five-wire, AC 380V/220V±7.5%,50HZ± |
Working environment | Insulated floor or carpet |
dimensions | 1650mm×800mm×1650mm |
Training device main Meshed plate size |
798mm×768mm |
Training device dimensions | 2006mm×1003×2410mm |